Jose Marti Park, Florida
Coastal Systems provided civil engineering services for
the Jose Marti Park as part of the design team led by
Zyscovich. These services include the design of a
drainage system for a 1-acre site located partially below
Interstate 95. The design consisted of a drainage well to contain the stormwater runoff from the new building/gymnasium.
The remaining site stormwater runoff was managed by using 38- linear feet of exfiltration trench system and various dry retention areas. Paving, grading and stormwater management plans were prepared, that included right-of-way improvements for southwest 5th Street.
Coastal Systems also provided water and sewer design to
service the new building/gymnasium. The design included over 2,200 linear feet of 8-inch water main with fire, domestic and irrigation service. A new 6-inch sanitary sewer line was connected to an existing sanitary manhole to service the new building. Construction administration services were also provided.
|